Tuesday, October 20, 2009
The rubble left from the power pit installation has been removed. However there is a pot hole on the opposite side of the road where the electric company would have dug up to pull the underground cable. It is sealed with black tar but is not level with the road. I have called the electric company and asked them to fix it up.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment